| Lake Roesiger, Lake Bosworth online! | |
| By AaronTBird on8/2/2007 | |
| Service in Lake Roesiger is excellent on the North Lake! We have high speed coverage to the entire eastern shore and will bring the western shore online next week. Our innitial customers are reporting speeds of up to 7 meg, depending on location, so give a call if you are interested in service. We brought Lake Boswirth online yesterday, and are getting full speeds throughought the southern, northern and eastern shores of the lake. We should have the western shore online by mid month. |  | | Comments (0) |
|
|
| Storm Damage | |
| By AaronTBird on6/25/2007 | |
| One of the relays at Lake Alyson took damage from the storm last night, causing a brief interruption for those customers. We are on our way out with a replacement and will have it back online this evening. Thanks for your patience, Aaron |  | | Comments (1) |
|
|
| Lake Alyson Installs, Lake Roesiger Service; the begining of a great summer! | |
| By AaronTBird on6/22/2007 | |
| Lake Alyson residents are coming online quickly, with 14 customers so far. Today we went door to door in the neighborhood handing out information packets and meeting everyone. We had a lot of excited people and a lot of support, thanks for choosing Thunderbird and welcome aboard. Today we also finalized arrangements for the main service link into Lake Roesiger. We should have repeaters an ... |  | | Comments (0) | More... |
|
| WOW! | |
| By AaronTBird on5/17/2007 | |
| The Lake Alyson links are up and running and the coverage is amazing! We just picked up the signal 8 miles away near Frontier Airpark with an RSSI well above -70! As soon as the customer equipment comes in we can start getting everyone hooked up :) Regards, Aaron |  | | Comments (0) |
|
|
| Lake Alyson Progress | |
| By AaronTBird on5/13/2007 | |
| We just finished building out the Tower Relay for Lake Alyson, and it's a beauty! We have a great link from the tower to our backhaul relay site on the other side of the river and have tested the link into Lake Alyson with temporary gear on a tripod. The results were very exciting - A high speed, stable link with low latency. We expect even better performance from the permanent mount, which we will be installing tomorrow. < ... |  | | Comments (0) | More... |
|
| Lake Alyson! | |
| By AaronTBird on5/10/2007 | |
| We have finally managed to find a way to engineer a backhaul into Lake Alyson! We found a location with line of sight to our tower as well as to Lake Alyson and have come to an agreement with the owner of the property where we are going to locate the backhaul relay. We are going out this afternoon to test the equipment and plan the access point distribution throughout the community. We expect to have service available throughout Lake |  | | Comments (0) | More... |
|
| Growing Pains - Telephone | |
| By AaronTBird on4/19/2007 | |
| Hello, Some of you may have noticed that our telephone has been having issues the past week. It seems something had been botched up during our service upgrade to the phone system and we were stuck without phone service for a couple of days. We have resolved the problem and everything is working properly again. Regards, Aaron |  | | Comments (0) |
|
|
| Aspen Installs, fun with faulty hardware, Firetrail Road and Lake Loma | |
| By AaronTBird on2/23/2007 | |
| We were out doing installs at Aspen today and everything was moving along just fine when suddenly...nothing happened. We were as mystified as you are. Our gear just stopped passing traffic. Unfortunately we were doing an install at the time so we spent a good hour troubleshooting the install untill we were finally able to track it back to the relay. Right about that time the hail turned to snow. We started replacing wires, switches, power supplies, anything we could think of we replaced and still no luck.As it turned out the radio that brings the main link into Aspen got too cold and the internal heater was not keeping up. I adjust the thermostat settings and we now have the system back online :) We go back to the location tomorrow to move the radio into a heated area, away from exposure to the elements. It set us behind schedule on a couple installs and delayed our Lake Bosworth test, but we will be caught up by early next week. I'm just glad we were able to f ... |  | | Comments (8) | More... |
|
| Lake Bosworth, Aspen and Deer Mountain updates | |
| By AaronTBird on2/22/2007 | |
| Looks like it's time for another Thunderbird Update :) Tomorrow (Friday) afternoon we are doing a survey at Lake Bosworth for a possible repeater station that would allow us to service the entire lake shore. This is great news for the Bosworth community, since there is no form of broadband available there at the moment. I'll post a follow-up with the results of the survey this weekend for those of you that are waiting. Aspen is coming along perfec ... |  | | Comments (0) | More... |
|
| Aspen is online! | |
| By AaronTBird on2/17/2007 | |
| Thats right, the Aspen community of Tulalip/Marysville is now online! We pulled a -75 dbi link with 3ms latency off the tower, 17 miles to the Point of Prescence, with a 2' parabolic grid antenna (lovingly nicknamed "The BBQ".) The 5.8Ghz Line of Sight link pulls a steady 7-8meg down and 5-6 meg up link. That link then connects into the back of a 2.4Ghz 802.11b radio with a 15dbi omni to redistribute the backhaul link to the neighborhood. Ben grabbed some snapshots with his camera and will upload them when he gets back from his vacation next week. Dennis and I go out tomorrow morning to test range on the client radios from the POP. I'll post results this weekend. Special thanks goes out to Don for letting us locate on his property. Regards, Aaron |  | | Comments (4) |
|
|